Home/Projects/GMP-Compliant Production Suite
Pharmaceutical

GMP-Compliant Production Suite

ISO Class 7 cleanroom with full HVAC integration and validation documentation.

ISO Class 7
Classification
1,200 m²
Floor Area
22 weeks
Delivery
2025
Completed
The Brief

GMP-Compliant Production Suite — Shah Alam, Selangor

The client needed to add a GMP oral solid dosage line inside an operating facility without interrupting existing production. CityPoint delivered a fully modular ISO Class 7 envelope — wall panels, ceiling grid, hermetic doors and pass-through boxes — fabricated off-site and installed in phased night works.

Airflow was designed for 25 air changes per hour with pressure cascades across the gowning, staging and compression rooms. Every panel joint was coved and sealed for washdown, and the completed suite was handed over with full IQ/OQ validation documentation ready for regulatory audit.

Modular wall panel envelope, coved and sealed
Walkable ceiling grid with HEPA terminal units
Pressure-cascaded gowning and material airlocks
IQ/OQ validation pack and certification support
CityPoint worked around our production schedule and still handed over ahead of the validation deadline. The suite passed audit first time.
Plant Engineering Manager · Pharmaceutical client, Selangor
Get in Touch

Let's build your perfect cleanroom

Planning a new facility, upgrading an existing cleanroom, or sourcing components — our specialists will guide you through every step.

TEL
Phone / WhatsApp
+6012 223 0200
@
Email
enquiry@citypoint.my
Head Office

City Point Solutions Sdn Bhd
No. 7, Jalan PP16/4, Perdana Industrial Park,
Taman Putra Perdana, 47130 Puchong, Selangor.

Monday – Friday, 8.30am – 5.30pm

Request for Enquiry

Tell us about your facility, products or quantities — our specialists will come back within 24 business hours.