Home/Projects/Hygienic Packaging Hall
Food Processing

Hygienic Packaging Hall

Washdown-rated cleanroom with coved flooring and positive-pressure air handling.

ISO Class 8
Classification
1,450 m²
Floor Area
20 weeks
Delivery
2023
Completed
The Brief

Hygienic Packaging Hall — Nilai, Negeri Sembilan

High-care packaging lines needed an enclosure that survives twice-daily caustic washdown while holding a positive pressure against the surrounding warehouse. CityPoint specified stainless-skinned panels with fully welded, coved floor junctions and hygienic door hardware on every opening.

The air handling package delivers filtered make-up air at a measured overpressure so that dust from the raw goods aisle can never migrate into the hall. Drainage falls were coordinated with the panel setting-out before fabrication, which kept the installation programme to twenty weeks.

Stainless-skinned panels rated for caustic washdown
Fully coved, drained floor-to-wall junctions
Positive-pressure make-up air against the warehouse
Hygienic door hardware and flush glazed vision panels
Two years of daily washdown and the envelope still looks like handover day.
Operations Manager · Food processing client, Negeri Sembilan
Get in Touch

Let's build your perfect cleanroom

Planning a new facility, upgrading an existing cleanroom, or sourcing components — our specialists will guide you through every step.

TEL
Phone / WhatsApp
+6012 223 0200
@
Email
enquiry@citypoint.my
Head Office

City Point Solutions Sdn Bhd
No. 7, Jalan PP16/4, Perdana Industrial Park,
Taman Putra Perdana, 47130 Puchong, Selangor.

Monday – Friday, 8.30am – 5.30pm

Request for Enquiry

Tell us about your facility, products or quantities — our specialists will come back within 24 business hours.